The Spring Canyon Water and Sanitation District has been working with Civil Worx Engineering firm in continuing to utilize and fully develop our Capital Improvements Program
- Phase 1 Waterline Replacement Map
- Exhibit – Survey Control Point Locations
- Primary Survey Control Points
- 20191015 ADDENDA TO FCLWD STANDARD CONSTRUCTION SPECIFICATIONS (2)
- FCLWD-Standard-Construction-Specs-072519
- SCWSD METER PIT SPEC
- SFCSD-Standard-Construction-Specifications
- Pressure Zone Areas Map